This condominium PFI case study shows how SGFacadeScan supports MCSTs, managing agents and building owners with a structured Periodic Facade Inspection workflow for residential buildings in Singapore. The project for a condominium building in Singapore involved 100% visual inspection using drone capture, minimum 10% close-range inspection by rope access, defect documentation, assessment and recommended repair actions.

For residential developments, the value of PFI is not only compliance. A clear inspection record helps the MCST understand facade condition, prioritise repair budgets and communicate next steps to council members, residents and appointed contractors.

Screenshot 1
Case Study

Case Study Snapshot

Item

Case Study Details

Project
Condominium Building in Singapore
Building Type
Residential condominium
Number of Blocks
1 block
Building Age
27 years old at the time of the PFI report
Height
Approximately 80m to 100m
Number of Storeys
25 storeys
Main Facade System
Reinforced concrete with plaster finish, decorative concrete cornices, aluminium casement and top-hung windows, aluminium louvres, air-con units, aluminium/glass drop-off canopy, polycarbonate roof attachments and RC flat roof.
Inspection Scope
100% visual inspection using drone and minimum 10% close-range inspection using rope access.
Inspection Outcome

No unsafe defect was found. Several defects required repair, and no full facade inspection was required for this case study.

IMG 6226 scaled
Condominium Building

What Was Inspected at the Condominium Building

100% drone visual inspection

The 100% visual inspection covered all facade systems of the building. Drone images were captured systematically from top to bottom of each elevation, with close-up photos taken where visible defects were identified. This supported a complete photographic record of the condominium elevations and helped the inspection team locate defects for assessment.

Minimum 10% close-range inspection by rope access

Selected facade areas were checked at close range using rope access. The close-range locations were chosen to capture different facade elements, including windows, louvres, air-conditioning condenser zones, concrete wall areas, roof/canopy elements and other facade attachments. Close-range inspection allowed closer verification of defects that cannot be fully assessed from ground level or drone images alone.

Defect assessment and reporting

The findings were classified for safety and repair planning. For this case study, the inspection record identified no unsafe facade defect, but noted multiple repair-required items such as paint blistering, cracks, corrosion, hollowness, defective window gasket, efflorescence, missing window hinge screw, peeling paint and localised wall defects.

Condominium PFI

Key Facade Findings from the Condominium PFI

The defects found at this condominium building are typical of ageing residential facades in Singapore. They show why condominium PFI should be planned as both a compliance exercise and a practical maintenance tool.

Defect Category

Example Findings in This Case Study

Why It Matters for MCSTs and Managing Agents

Paint blistering, paint bubble and peeling paint
Paint blistering, paint bubble and peeling paint were identified on several elevations and levels.
Paint failure may indicate weathering, moisture entry or substrate deterioration. It should be repaired before larger areas deteriorate.
Plaster / paint cracks and chipped concrete

Plaster/paint cracks, crackline and chipped concrete were recorded.

Cracks and chipped areas should be assessed and repaired to reduce water ingress and potential falling-object risks.
Efflorescence and moisture staining
Efflorescence and moisture staining were observed on facade surfaces.
Efflorescence may indicate moisture movement. The repair approach should include checks for water seepage or root cause, not only repainting.
Corroded metal and louvres
Corroded metal and corroded metal louvre were identified.
Corroded fixings or metal elements may weaken over time and should be cleaned, protected or replaced if badly corroded.
Window-related defects
Missing window hinge screw and dislodged window rubber gasket were found during close-range inspection.
Window defects can affect water tightness, operability and safety. They are especially important for high-rise residential facades.
Hollowness and wall defects
Hollowness in wall and hole in wall were recorded.
Hollow or debonded plaster should be repaired to prevent further delamination and possible falling hazards.
Case Study

Sample Case Study Photos

Use the following sample photos to support the webpage visually. Do not publish sensitive report reference numbers, signatures, personal contact details or full internal report pages on the live site.

defectissue 04 mar 2026 10 48 44 am a007 7 scaled

Failed sealant / open joint

Failed sealant and open horizontal joint with visible staining, indicating a possible water ingress pathway.

defectissue 04 mar 2026 10 53 29 am a014 17 scaled

Louvre frame sealant gap / rust staining

Louvre frame joint with deteriorated sealant, visible gap and rust staining from adjacent fixing components.
WhatsApp Image 2026 07 05 at 4.57.37 PM

Open vertical panel joint

Open vertical facade panel joint with failed sealant and visible cavity, requiring repair assessment.

WhatsApp Image 2026 07 05 at 4.57.38 PM

Close-range failed panel joint sealant

Close-range verification of failed sealant gap at vertical panel joint, confirming repair requirement.

IMG 5914 scaled

Efflorescence

Efflorescence on external wall crack and localised plaster deterioration near the window bay

WhatsApp Image 2025 08 25 at 22.47.27 6a8b122b

Louvre / door frame staining

Missing louvre panels above door
IMG 8918 scaled
Outcome

Assessment Outcome

For this condominium PFI case study, the facade condition was assessed with no unsafe defect found. The identified defects were classified as requiring repair and were assessed to be non-critical at the time of inspection. The report concluded that no full facade inspection was required.

The practical message for MCSTs is that a condominium may still pass the safety-critical stage of PFI while having several repair-required items that should be budgeted, scheduled and followed up. A clear defect schedule helps the council prioritise works and keep facade maintenance accountable before the next inspection cycle.

Similar Condominium Defects

Recommended Remedial Approach for Similar Condominium Defects

Observed Defect

Recommended Remedial Direction

Indicative Timeframe

Corrosion on fixing or metal item
Remove surface rust, clean the surface, apply anti-rust zinc-rich primer and replace fixings with stainless steel grade SS304 or higher where required. Badly corroded items should be replaced.
6 months or next repair cycle, whichever is earlier.
Plaster crack
Remove loose plaster, cut a V-groove along the crack, patch with polymer-modified cement mortar, apply bonding agent, re-plaster and repaint with weatherbond paint.
6 months or next repair cycle, whichever is earlier.
Hollowness in wall
Hack and remove hollow or debonded plaster to the substrate, treat associated cracks, apply bonding agent, re-plaster and repaint where required.
6 months or next repair cycle, whichever is earlier.
Paint blistering / peeling paint
Remove blistered or loose paint to sound substrate, re-plaster where required, allow to cure and apply primer and two coats of suitable exterior paint.
6 months or next repair cycle, whichever is earlier.
Efflorescence
Remove deposits and porous paint, treat the substrate, repaint where required and check the root cause such as water seepage.
6 months or next repair cycle, whichever is earlier.
Defective window gasket
Remove defective gasket or seal, clean the area, measure replacement seal accurately and reinstate with suitable gasket or sealant system.
6 months or next repair cycle, whichever is earlier.
IMG 8916 scaled
MCSTs and Managing Agents

Why This Case Study Matters for MCSTs and Managing Agents

PFI in Singapore

How SGFacadeScan Supports Condominium PFI in Singapore

Before inspection planning begins, the MCST or managing agent should prepare the available building records. Not every document may be available, but early preparation helps reduce delay and avoid repeated follow-up requests.

Step

SGFacadeScan Support

1. Notice and record review

Review BCA PFI notice, available drawings, past maintenance information and known facade defect records.

2. Inspection planning
Plan access strategy for different elevations, roof areas, balconies, windows, louvres, canopies and other facade attachments.
3. 100% visual inspection
Coordinate drone-assisted visual inspection where suitable, with systematic photo capture of all elevations.
4. Minimum 10% close-range inspection
Coordinate rope access or other safe access methods for selected facade zones requiring tactile or close-up assessment.
5. Defect documentation
Prepare photo-based defect records with location, observation, defect type and repair priority.
6. Reporting and submission support
Support PFI report preparation, CP review, FI input and follow-up with the building owner or managing agent.
Resources & FAQs

Frequently Asked Questions

1. What is a condominium PFI case study?

A condominium PFI case study is a real project example showing how a residential building facade was inspected, what defects were found and what repair or follow-up actions were recommended.
Drone inspection supports the 100% visual inspection by capturing high-level facade photos and videos. PFI also requires close-range inspection of selected areas, typically using rope access, gondola, boom lift or other suitable access methods.
Not always. “Require repair” means the defect should be rectified within the recommended timeframe. In this case study, no unsafe defect was found, but several items still required repair to maintain the facade properly.

SGFacadeScan can help MCSTs and managing agents understand the defect findings, organise photo records, prioritise repair actions, communicate with council members and plan the next steps needed for compliance and maintenance.

Free Download

PFI Checklist for MCSTs & Building Owners

A practical preparation guide for managing your Periodic Façade Inspection efficiently — reduce delays and plan follow-up actions with confidence.

Prepared by SGFacadeScan Pte. Ltd. — Competent Person-led PFI guidance.

Get the free PFI Checklist

Tell us where to send it and we’ll email a copy plus practical PFI tips for MCSTs and building owners.

We respect your privacy. Your details are used
only to send this checklist and related PFI guidance.